The charrette has met its’ midpoint and work is paused over the weekend to give an opportunity for public input. Work will resume on Tuesday. Below you will find the mid-term presentation and a short survey. Please also visit our interactive map tool where you will also find the same survey along with the ability to zoom in to the plan details and comment on specific elements through the map tool.


Presentation Video


Slides: Midterm Presentation


Preliminary Masterplans

Additional Information for Each Plan

Preliminary plan for Structure Plan 1
  • Proposes complete neighborhoods extending over the 70 metre line (thehill top is at 150 metre elevation) in exchange for preservation of a large portion of the hilltop for conservation and public use.
  • Provides a balanced diversity of housing types on a variety of lots sizes.
  • Distributes open spaces, trails, and parks throughout the neighborhoods,  providing residents convenient access to open space and community amenities.
  • Defines a rich network of trails and pedestrian passageways from the hilltop preserve down to the waters edge and around the peninsula.
  • Views to the water are pulled deep into the site to maximize the number of houses with direct views out.
Preliminary plan for Structure Plan 2
  • Proposes complete neighborhoods extending over the 70 metre line (the hilltop is at 150 metre elevation) in exchange for preservation of a large portion of the hilltop for conservation and public use. Specifically the land over the 70 meter elevation line is proposed in this plan to be large estate lots at a 1,500 square metres.
  • Provides more density around the neighborhood centers to balance the large lots along the hillside.
  • Distributes open spaces, trails, and parks throughout the neighborhoods,  providing residents convenient access to open space and community amenities..
  • Defines a rich network of trails and pedestrian passageways from the hilltop preserve down to the waters edge and around the peninsula.
  • Views to the water are pulled deep into the site to maximize the number of houses with direct views out. 
Preliminary plan for Structure Plan 3
  • Proposes no development extending over the 70 metre line, with the exception of environmental living parcels, privatizing the hilltop.
  • Provides the least diverse option of housing types of the 3 plan options.
  • Allocates limited open spaces, trails, and parks throughout providing residents easy access to open space.
  • Defines a rich network of trails and pedestrian passageways along the hillside and around the peninsula.
  • Views to the water are pulled deep into the site to maximize the number of houses with direct views out.